Wind Farm Development

India is Targeting the Nat zero emission by 2070, the carbon intensity by 33-40% in the year 2030. The Green energy is going Rapidly in India. Onshore Windfarms is one of the easy way to generate the electricity from the renewable energy source. Now we currently developing the land for IPP’s

Wind Farm Development

Our Approach to Wind Farm Development


Site Selection & Feasibility Studies
We start by analyzing wind resources, land features, and environmental factors to find the best location for the wind farm. We conduct wind assessments, environmental studies, and grid analysis to ensure the site is ideal for energy production.

Environmental Impact & Permitting
Sustainability is key. We assess the environmental impacts of each project and work to minimize effects on wildlife and local ecosystems. We also navigate the permitting process to secure all necessary approvals from local and national authorities.

Design & Engineering
Once the site is ready, our engineers design a wind farm tailored to the location. This includes deciding where to place turbines, building access roads, and ensuring everything is set up for efficient energy generation and grid connection.

Construction & Installation
After the design is finalized, we begin construction. Our team handles site preparation, turbine assembly, and grid connections, ensuring minimal environmental impact during installation.

Operations & Maintenance
After the wind farm is up and running, we monitor its performance and handle ongoing maintenance to keep everything operating efficiently, maximizing energy production and minimizing downtime.